Planning, design, and independent review

Industrial modular data center design

4sight designed a modular industrial data center into a new multi-story building against ANSI/TIA-942 Rated-3 requirements, with the building design team.

Sector
Industrial
Region
Not stated
Standard or method
ANSI/TIA-942 Rated-3 requirements
4sight’s role
Data center design with the building architects and the MEP consultants
Industrial building section showing phased data center modules inside its structural bays.
Illustration of the project context

4sight designed a data center for an industrial owner inside a new multi-story building. The design was a modular deployment against ANSI/TIA-942 Rated-3 requirements, coordinated with the building architects and the mechanical, electrical and plumbing (MEP) consultants while the floors were still being drawn. The owner adopted the design.

The challenge

The data center had to align with the building's architecture, interior and safety requirements. Power, cooling, network, security and life safety had to be designed into the building during its own design. The owner wanted the facility to stay modular and scalable, and the building program was aggressive.

A module has to respect slab, riser and plant space. Treated as a box that arrives later, the module leaves the Rated-3 requirements for maintainability and separation nowhere to land.

What 4sight did

4sight designed the facility as a capacity sequence, so later capacity is added in modules inside the new building. The design was coordinated with the building architects and the MEP consultants against the Rated-3 requirements. Modular deployment here means a capacity sequence tied to the building, not a container set on a finished floor.

What the owner received

  • A modular capacity and expansion basis tied to the building.
  • Coordinated data center design information for power, cooling, network, security and safety.
  • An interface record with the building architects and the MEP consultants.
  • Requirements and standards-alignment documentation against the Rated-3 target.
  • Fit-out sequencing inputs, so the building program and the data center program can be read together.

Sequencing and cost inputs served as design controls. Design alignment is not a certification body's result.

Frequently asked questions

  • 4sight designed a data center for an industrial owner inside a new multi-story building, and the owner adopted that modular design. It was a modular deployment against ANSI/TIA-942 Rated-3 requirements. 4sight coordinated the design with the building architects and the mechanical, electrical and plumbing consultants while the floors were still being drawn. Design alignment on this industrial assignment is not a certification body's result.

  • This industrial modular data center design used ANSI/TIA-942 Rated-3 requirements. 4sight designed the facility as a capacity sequence, so later capacity is added in modules inside the new building. Modular deployment here means a capacity sequence tied to the building, not a container set on a finished floor. The work was coordinated with the building architects and the MEP consultants. The alignment record is not a certification body's result.

  • Another owner can copy the coordination method from this industrial modular data center design by 4sight. Design the data center with the building architects and the MEP consultants while the floors are still being drawn. Tie each module to slab, riser and plant space. Keep a capacity and expansion basis, an interface record and fit-out sequencing inputs so the building program and the data center program can be read together.