4sight assessed an existing bank building against the owner's growth needs and the ANSI/TIA-942 Rated-3 requirements for spaces and slab loading. The building did not pass that structural and spatial test. 4sight recommended an alternate site, and the owner chose to pursue one rather than commit capital to a building that could not reach the objective.
The challenge
The owner asked two questions. Could the existing facility support future growth? Could the building meet the space and slab-loading requirements of the Rated-3 objective?
Slab loading is the structural test. Space is the planning test, because a rated arrangement needs room for plant, pathways and separation. A Rated-3 objective is lost on the slab and the floor plate even when the equipment schedule still looks complete.
What 4sight did
- Assessed the site and recorded the constraints the building presented.
- Tested the facility against the owner's future growth requirements, including efficiency and scalability.
- Checked the building against the Rated-3 requirements for spaces and slab loading.
- Recommended an alternate site and left the property choice with the owner.
What the owner received
A recommendation report that gave the evidence for a stop-or-move decision. It showed that the site could not meet the space and slab-loading requirements of the Rated-3 objective, and that the existing facility could not be upgraded to meet the efficiency and scalability needs the assessment established. The building failed the test; the bank's operating procedures were not the cause.
The report was neither a design for the unsuitable building nor a land search. 4sight did not select the property or commit the capital.
Frequently asked questions
The banking site assessment found that the existing bank building did not pass the structural and spatial test. 4sight tested it against the owner's growth needs and the ANSI/TIA-942 Rated-3 requirements for spaces and slab loading. 4sight recommended an alternate site. The owner chose to pursue one rather than commit capital to a building that could not reach the objective. The report was a stop-or-move recommendation, not a design.
4sight applied the ANSI/TIA-942 Rated-3 requirements for spaces and slab loading on this banking site assessment. Slab loading was the structural test. Space was the planning test, because a rated arrangement needs room for plant, pathways and separation. 4sight also tested the existing facility against the owner's future growth requirements, including efficiency and scalability. The building failed that test. The bank's operating procedures were not the cause.
Another owner can copy the sequence 4sight used on the banking site assessment. Record the constraints the building presents. Test the facility against future growth, including efficiency and scalability. Check the building against the Rated-3 requirements for spaces and slab loading before capital is committed. Then recommend an alternate site if the building cannot reach the objective, and leave the property choice with the owner.